FPSO Cuulong MV9 | Projects | MODEC
The FPSO Cuulong MV9 is installed in 48 m water depth. First oil was achieved on October 29, 2003, approximately 18 months after contract award. The FPSO is a new-build FPSO with storage capacity of 1,000,000 barrels. Topside facility is provided with 65,000 bopd of oil handling capacity, 35 mmscfd of lift gas system and 82,500 bpd of water ...